January 03, 2006

back to work

Back to work, feh. Except my email server is down, so there's not much I can do at the moment. (I keep trying to think of reasons to be glad to get back to work, but have not yet succeeded.)

I did manage to finish assembling my Banff sweater and knitting the neck last night, so it's all done except for weaving in the ends. I'll try to get a picture tonight. I like the short body length, but probably should have made the sleeves a little shorter. It's a bit floppier than I think it's meant to be, because I used a very soft wool and knit it at a fairly loose gauge. The latter is a good thing, though, since I live in Arizona rather than Canada (like Jenna, the sweater's designer). It's plenty loose, as it's meant to be, and I think more flattering than some I've seen that came out too tight on their creators, though probably not as much as it would have been if it were a little stiffer. But it's wicked comfortable, which I think is the point of this sweater.

Next I need to finish the gloves for my dad (the pinky, ring and middle finger of each hand are done - two more fingers and two thumbs to do, then assembly of the whole) and to start on a sweater for Rudder. This one will be basic top-down raglan, knitted all at once with no seams. He's asked for ribbed cuffs and waist and a slightly extended neck, somewhere between a crew and a turtleneck.

It's going to be a lot harder to progress quickly with all this work stuff taking up my days.

Posted by dichroic at January 3, 2006 09:38 AM
Comments
Post a comment









Remember personal info?